Study on Construction Method of Infl atable Membrane Shed in Niyanghe Sand and Gravel Yard
-
摘要: 为促使川藏铁路创“精品工程、创新工程、绿色工程、安全工程、廉洁工程”目标顺利达成,尼洋河砂石加工场成品料仓采取全封闭气膜工艺,使成品骨料始终处于稳定的封闭环境中,以保障成品质量不受雨雪、风沙等影响。本文结合该项目实际,就砂石料场充气膜棚施工要点予以简要探讨,以供借鉴参考。Abstract: In order to promote the Sichuan Tibet railway to achieve the goal of "high-quality project, innovation project, green project, safety project and integrity project", the finished product silo of Niyanghe sand and gravel processing plant adopts the fully closed air fi lm process to keep the fi nished aggregate in a stable closed environment, so as to ensure that the quality of fi nished products is not aff ected by rain, snow, wind and sand. Combined with the actual situation of the project, this paper briefl y discusses the key points of the construction of infl atable membrane shed in sand and gravel yard for reference.
-
Key words:
- niyang river /
- sand and stone yard /
- infl atable membrane shed /
- construction method
-
[1] 刘志栋,纪如碧,吴波,等.大型彩色不规则曲面膜结构施工技术[J].建筑技术,2020,51(4):481-484. [2] 杨超.薄膜结构的有限质点法计算理论与应用研究[D].杭州:浙江大学,2015. [3] 黄祺合,芦继忠,陶富录,等.大跨度膜结构屋面安装施工技术[J].建筑施工,2018,40(9):1 541-1 543. [4] 李中立,宋小兵.膜结构在大跨度结构中的应用[A].天津大学.第十三届全国现代结构工程学术研讨会论文集[C].天津大学:全国现代结构工程学术研讨会学术委员会,2013:8.
点击查看大图
计量
- 文章访问数: 39
- HTML全文浏览量: 3
- PDF下载量: 1
- 被引次数: 0