Real Estate Project Garden Project Investment Cost Control Method Analysis—— Take the Landscape of Chunxiao District in Bashan, Enshi Prefecture as an Example
-
摘要: 园林成本控制贯穿于恩施巴山春晓小区园林景观工程各阶段,主要控制在园林项目实施前的准备阶段 (方案编制论证阶段、施工图修订阶段、招投标阶段 ) 及施工过程的成本控制。而施工前的准备阶段是明确控制工程成本与建设园林效果目标的初始时期,是投资决策的主要依据、关键点。本文就如何控制房产项目园林成本的重要性做出分析。Abstract: Garden cost control runs through all stages of landscape engineering in Bashan Chunxiao Community,Enshi, mainly in the preparation stage (scheme preparation demonstration stage, construction drawing revision stage, bidding stage) and the cost control of the construction process.The preparation stage before the constructi on is the initial period of clearly controlling the project cost and the construction garden effect goal, which is the main basis and key point of the investment decision.This paper analyzes the importance of how to control the garden cost of real property projects.
-
[1] 纪忠荣.园林绿化工程管理与投资成本控制探讨[J].现代园艺, 2019(2):202-203. [2] 叶露.经济技术开发区政府投资型园林绿化项目成本控制研究[D].南京:东南大学,2017. [3] 闭秀丽.园林绿化施工过程的投资成本控制[J].住宅与房地产,2016(21):98+109. [4] 崔晓蓉.加强园林绿化工程管理,合理控制投资成本[J].现代园艺,2016(10):187. [5] 余杰,周文杰.园林绿化工程管理与投资成本控制[J].现代园艺,2014(14):196-197. [6] 谭粜新.园林绿化工程管理与投资成本控制[J].湖南农机,2010,37(9):239-240. [7] 梁媛华.浅谈如何控制园林工程的投资造价和降低施工项目成本[J].科技经济市场,2007(5):152-153.
点击查看大图
计量
- 文章访问数: 21
- HTML全文浏览量: 0
- PDF下载量: 0
- 被引次数: 0