摘要: 为了有效评估基坑工程施工风险,本文在构建风险评估指标体系的基础上,采用有序加权算子赋权和物元可拓模型相结合的评价方法,通过计算待评物元与评价等级的关联度和等级特征值,从定量的角度评估基坑工程施工风险等级,提高了风险评估的客观性,实例分析表明将有序加权算子与物元分析方法运用于基坑施工阶段风险评估具有可行性和实用性。Abstract: In order to evaluate the construction risk of foundation pit engineering effectively, this paper adopts the evaluation method which combines the weight of ordered weighted operator and matter element extension model on the basis of constructing the risk evaluation index system, by calculating the correlation degree and the grade characteristic value between the matter element to be evaluated and the evaluation grade, the risk grade of foundation pit construction is evaluated quantitatively, which improves the objectivity of the risk evaluation, the example analysis shows that the application of ordered weighted operator and matter element analysis method to the risk assessment of foundation pit construction stage is feasible and practical.
-
Key words:
- measured data /
- foundation pit engineering /
- risk assessment /
- extension assessment
-
[1] 李龙,赵金先,李帆.基于熵法与灰色理论的地铁工程项目管理绩效评价[J].青岛理工大学学报,2014,35(3):50-55+60. [2] 闫文周,徐静,吁元铭.神经网络在工程项目管理绩效评价中的应用研究[J].西安建筑科技大学学报(自然科学版),2005,37(4): 557-560. [3] 成芳宇.基于DMAIC模型的大连某地铁车站深基坑施工安全风险管控[D].大连:大连交通大学,2020. [4] 蔡文.可拓集与可拓数据挖掘[M].北京:科学出版社,2008. [5] 张思荣,裘樨盈,张敏,等.基于可拓学与BSC的工程项目绩效评价研究[J].工业工程与管理,2012,17(1):64-69. [6] 于浩.大型建筑施工企业项目管理的绩效评价研究[D].北京:北方工业大学,2009. [7] 王增民,吴冲.可拓学在工程项目管理绩效评价中的应用[J].科技管理研究,2009(10):106-108.
点击查看大图
计量
- 文章访问数: 13
- HTML全文浏览量: 5
- PDF下载量: 1
- 被引次数: 0