Rail Connecting Lines C0/C2 Switch Scheme Research
-
摘要: 本文结合现场实际情况,针对站间距较短的车站,从节省工程投资的角度考虑,通过对列控、联锁系统逻辑关系进行分析,由一套列控中心实现了 C0/C2 级间切换功能。Abstract: Aim at stations with short distance, the logical relationship between train control system and interlocking system was analyzed base on the actual situation, a solution was proposed to realize the switching function between CTCS-0 and CTCS-2 from the perspective of saving investment.
-
Key words:
- train control center /
- switching between levels /
- program research
-
[1] 国家铁路局.TB/T3484-2017.列控系统应答器应用原则[S].北京:中国铁道出版社,2017. [2] 国家铁路局.TB/T10007-2017.铁路信号设计规范[S].北京:中国铁道出版社,2017. [3] 国家铁路局.TB/T3439-2016.列控中心技术条件[S].北京:中国铁道出版社,2016. [4] 中国铁路总公司.Q/CR662-2018.列控系统临时限速技术规范[S].北京:中国铁道出版社,2018. [5] 沈洪波,张小刚.CTCS-2级列控系统级间切换设置探讨[C]// 中国铁道学会.中国铁道学会,2012. [6] 姜明华.列控系统级间转换点临时限速区段设置探讨[J].铁道通信信号,2013, 49(4):32-33. [7] 崔宁宁.列控系统C0/C2级间转换方案的探讨及案例分析[J].铁道通信信号,2016, 52(6):29-30. [8] 张劼.厦深线接入广深线C0/C2,C2/C0列控级间转换工程设计探讨[J].铁路通信信号工程技术,2019,v.16;No.107(11):94-100.
点击查看大图
计量
- 文章访问数: 51
- HTML全文浏览量: 2
- PDF下载量: 2
- 被引次数: 0