Study on Hole-forming Construction Technology of Pile Foundation Casing Full Rotary Drill under Complex Construction Conditions
-
摘要: 在一些复杂地形环境中进行钻孔灌注桩施工作业时,非常容易出现各类问题,从而对施工安全性和工程质量产生影响。例如,在岩溶发育地带进行钻孔作业时,常规的作业方式为采用冲击钻抛填或冲击钻冲孔后钢护筒跟进方式进行施工,传统的作业方法容易导致岩溶地形发生坍塌、漏浆等危险情况。为了更好地改进复杂施工条件下的钻机成孔施工质量,本文以复杂岩溶地形环境为具体分析对象,对桩基套管全回钻孔机施工的具体方案进行分析,以期可以促进复杂环境下施工作业的效率及质量提升。Abstract: When bored pile construction is carried out in some complex terrain environments, various problems are very easy to occur, thus aff ecting the construction safety and engineering quality. For example, when drilling in karst development zone. The conventional operation method is to use impact drill to throw and fi ll or steel casing to follow up after punching. The traditional operation method is easy to cause dangerous situations such as collapse and slurry leakage in karst terrain. In order to better improve the drilling quality under complex construction conditions, this paper takes the complex karst terrain environment as the concrete analysis object,and analyzes the concrete construction scheme of pile foundation casing full-return drilling machine, in order to promote the effi ciency and quality of construction operation under complex environment.
-
Key words:
- full rotation of pile foundation casing /
- construction /
- karst environment
-
[1] 毛宗原,何刚,毛刚,等.临地铁全回转干成孔灌注桩承载力特性实例分析[J].建筑科学,2021,37(3):131-137. [2] 刘笔艳,张慧,李宏伟,等.全套管全回转工艺在岩溶塌陷区桩基施工中的应用[J].土工基础,2021,35(1):11-12+23. [3] 刘军安,乐俊,杨慧齐,等.超厚回填土岩溶强发育区双套管双驱动全回转超长桩施工技术[J].施工技术,2020,49(24):100-102+105. [4] 赵康康,周石喜,倪耀文,等.高强度深厚基岩地铁车站咬合桩工法比选[J].云南水力发电,2020,36(9):98-101. [5] 李卓文,张秀川,张帅,等.基于全回转全套管工艺的密集障碍桩区钻孔灌注桩设计与施工[J].施工技术,2020,49(23):115-119. [6] 崔寿凯,王向阳,李享,等.RJP工法桩+全回转咬合桩在富水软土地区地下连续墙侧壁堵漏中的应用[J].施工技术,2020,49(22):77-80.
点击查看大图
计量
- 文章访问数: 85
- HTML全文浏览量: 7
- PDF下载量: 2
- 被引次数: 0