Preliminary Planning Decision and Cost Control in Design Stage of Engineering Project
-
摘要: 建筑行业作为国民经济的重要组成部分,其对中国居民具有重要影响,当前许多建筑企业的发展模式已不适用于新时代的发展,这导致建筑行业的发展停滞不前,为了进一步改善建筑工程项目的质量和成本,企业内部管理人员必须注重建筑环节的造价控制,精确的管理建筑早期工作中的策划和设计,以便提高整体工程项目的工作进程,降低施工过程中的各项投入,实现建筑企业的更高效益。Abstract: As an important part of the national economy, the construction industry has an important impact on Chinese residents. At present, the development mode of many construction enterprises is not suitable for the development of the new era, which leads to the stagnation of the development of the construction industry. In order to further improve the quality and cost of construction projects, the internal managers of enterprises must pay attention to the cost control of construction links and improve the quality of construction projects In order to improve the work process of the whole project, reduce the investment in the construction process, and realize the higher efficiency of the construction enterprise.
-
[1] 杨洪海.大型工程建设项目前期策划阶段协同管理研究[D].天津:天津大学,2018. [2] 赵宗为.对工程项目前期策划与设计阶段造价控制的分析[J].金融经济,2018(14):197-198. [3] 王翠平.工程项目建设前期阶段工作对工程目标管理的影响研究[D].淮南:安徽理工大学,2018. [4] 朱梓菲.建设项目前期阶段的造价控制[J].四川建材,2018,43(2):224-225. [5] 陈贵华.对工程项目前期策划决策和设计阶段造价控制的思考[J].铁道工程学报,2018,28(3):7-10.
点击查看大图
计量
- 文章访问数: 39
- HTML全文浏览量: 2
- PDF下载量: 1
- 被引次数: 0