Research on Several Architectural Design Issues in the Evolution from Standard Stations in Operation to Complex Transfer Stations
-
摘要: 本文分析了运营中标准站向复杂换乘站演进中的若干建筑设计问题,得出车站形成应符合城市的总体规划、交通规划及线网规划要求,妥善处理与城市交通、地面建筑、地下管线、地下构筑物之间的关系,并应满足城市景观及环境保护要求。尽量减少房屋拆迁、管线迁改和施工对地面建筑、地面交通影响。Abstract: This article analyzes several architectural design issues in the evolution from standard stations in operation to complex transfer stations, and concludes that the formation of stations should meet the requirements of the city's overall planning, traffic planning, and line network planning, and properly deal with urban traffic, ground construction, The relationship between underground pipelines and underground structures shall meet the requirements of urban landscape and environmental protection. Minimize the impact of house demolition, pipeline relocation and construction on ground buildings and ground transportation.
点击查看大图
计量
- 文章访问数: 15
- HTML全文浏览量: 3
- PDF下载量: 0
- 被引次数: 0