Construction and Ventilation Technology of Large-section Multi-crossing Underground Workshop Tunnel Group
-
摘要: 地下洞室群施工操作面很多、施工繁杂工作多又交叉,施工中会产生很多有害气体,例如爆破气体、机械尾气、混凝土粉尘等,通风防尘问题尤为明显。施工通风良好,既可以确保劳动安全,还能创造最佳施工环境,提升施工效率,保证施工进度,地下洞室群结构与施工复杂性对地下洞室群通风问题有直接影响,因此有必要就地下洞室群通风情况展开分析。Abstract: The construction of underground cave group is very complex, with many operation surfaces, drilling, blasting, slag loading, transportation, injection anchor support and other process cross operation. The harmful gas such as blasting gas, exhaust from construction machinery and dust of concrete operation is produced in the construction, and the problem of ventilation and dust prevention is very prominent.Good construction ventilation is not only a necessity for labor safety, but also an important guarantee to create good construction environment conditions, improve work efficiency and speed up the construction progress. The structural characteristics of the underground tunnel group and the complexity of the construction process determine the particularity of the ventilation problem of the underground tunnel group.
-
Key words:
- underground cave group /
- structure /
- characteristics /
- complexity
-
[1] 孙会想,汪海平.特大型地下洞室群施工期通风技术研究及应用[J].现代隧道技术,2019,56(6):187-195. [2] 王红军,廖云江,晏明,等.大型地下厂房洞室群开挖方法创新与实践[J].云南水力发电,2020,36(4):40-43.
点击查看大图
计量
- 文章访问数: 10
- HTML全文浏览量: 3
- PDF下载量: 0
- 被引次数: 0