Research on Construction Technology for Steel Ring Reinforcement of Metro Tunnel
-
摘要: 当前在城市发展进程中,交通与环境的矛盾问题日益明显,城市隧道工程在空间上的交叉成为缓解这一矛盾的关键。在此背景下,交叉段既有隧道加固施工则成为重点控制的施工方案之一。本文将结合十五中站~武昌火车站明挖区间(简称“明挖区间”)这一具体工程,分析明挖段既有隧道钢环加固的范围设计、施工工艺流程及相关施工保障措施,以供参考。
-
关键词:
- 十五中站~武昌火车站区间 /
- 明挖段隧道钢环加固 /
- 施工方案
Abstract: In the current process of urban development, the contradiction between traffic and the environment has become increasingly obvious. The spatial intersection of urban tunnel projects has become the key to alleviating this contradiction. In this context, the reinforcement construction of the existing tunnel at the intersection has become one of the key construction plans. This article will combine the specific project of the 15th Middle School Station to Wuchang Railway Station's open-cut section (referred to as "open-cut section") to analyze the scope design, construction process and related construction safeguard measures of the steel ring reinforcement of the existing tunnel in the section of the open-cut section. -
[1] 蒋海军.明挖区间隧道施工对临近明挖高铁隧道影响的研究[J].中国市政工程,2019(5):77-80. [2] 王刚.双线明挖区间隧道全断面整体自行式衬砌台车施工技术[J].科学与财富,2019(12):52. [3] 阮小赛,刘晓毅.既有成型盾构隧道上新增明挖车站施工技术[J].建筑技术,2019,50(11):4-8. [4] 王喜桃.明挖法地铁车站施工安全风险及处理措施分析[J].冶金管理,2020(9):68-69.
点击查看大图
计量
- 文章访问数: 255
- HTML全文浏览量: 58
- PDF下载量: 3
- 被引次数: 0