Analysis on Quality Control Measures of Tunnel Waterproof and Drainage Construction
-
摘要: 隧道防排水系统是安全运营的关键保证,特别是严寒地区受冻融影响,一旦出现渗漏水将极大影响隧道运营质量和使用寿命 ;因此必须在施工前进行精心的策划,结合质量通病的防治措施,确保每个环节精细化施工,要对施工工序进行严格的控制,保证整个隧道防排水系统质量。Abstract: Tunnel waterproof and drainage system is a key guarantee for safe operation, especially in severe cold areas aff ected by freezing and thawing. Once there is water leakage, it will greatly aff ect the quality of tunnel operation and service life. Therefore,careful planning must be carried out before construction, combined with common quality problems. The prevention and control measures to ensure the meticulous construction of each link, the construction process must be strictly controlled to ensure the quality of the entire tunnel's waterproof and drainage system.
-
Key words:
- highway tunnel /
- waterproof and drainage /
- construction quality
-
[1] JTG-T3650-2020,中交一公局集团有限公司.公路桥涵施工技术规范[S]. [2] JTG/T3660-2020,中交一公局集团有限公司.公路隧道施工技术规范[S]. [3] JTJ07198,公路工程质量检验评定标准[S].
点击查看大图
计量
- 文章访问数: 65
- HTML全文浏览量: 3
- PDF下载量: 2
- 被引次数: 0