Analysis on Installation and Debugging of Equipment in Sewage Treatment Plant
-
摘要: 在污水处理厂设备安装以及调试工作过程中,应加强各环节的质量控制,从而为污水处理厂设备的高效使用打下坚实基础。基于此,本文探讨了污水处理厂设备安装和调试准备工作,研究了污水处理厂设备安装和调试实践及监控,以期促进污水处理厂设备安装调试工作的顺利开展。Abstract: In the process of equipment installation and commissioning in sewage treatment plant, the quality control of each link should be strengthened to lay a solid foundation for the efficient use of equipment in sewage treatment plant. Based on this, this paper discusses the equipment installation and commissioning preparation of sewage treatment plant, the practice and monitoring of equipment installation and commissioning in sewage treatment plant are studied, in order to promote the sewage treatment plant equipment installation and commissioning work smoothly.
-
Key words:
- sewage treatment plant /
- equipment installation /
- equipment debugging
-
[1] 贺国梁,孟繁昌.浅谈污水处理厂设备安装与调试[J].智能城市,2020(4):115-116. [2] 卢华东.污水处理厂设备安装调试技术及监控策略[J].设备管理与维修,2019(12):212-213. [3] 赵健.污水处理厂设备安装调试技术及监控策略分析[J].居舍,2018(26):101. [4] 黄志勇.关于污水处理厂设备安装与调试的安全管理探析[J].广东化工,2018(2):168+163. [5] 蔡强,邓啟家,孟薇.地下污水厂的设备安装与管理[J].设备管理与维修,2019(16):11-12. [6] 邱伟坚.污水处理厂设备安装调试的监控要点[J].中国市政工程,2019(2):52-54+93.
点击查看大图
计量
- 文章访问数: 62
- HTML全文浏览量: 4
- PDF下载量: 3
- 被引次数: 0