Calculation and Analysis of Long Distance Ventilation in TBM Tunnel Construction
-
摘要: TBM 法长大隧洞施工,长距离通风,问题突出,意义重大。本文通过计算分析、合理选型、优化匹配,采用一站式压入通风系统,通过严格管理,达到了通风标准,促进了工程进度,保证了良好的作业环境和员工的身心健康。Abstract: TBM method for long and long tunnel construction, long-distance ventilation, prominent problems and great significance. In this paper, through calculation and analysis, reasonable selection and optimal matching, the one-stop forced ventilation system is adopted. Through strict management, the ventilation standard is reached, the project progress is promoted, and the good working environment and the physical and mental health of employees are ensured.
-
Key words:
- TBM /
- tunnel /
- long distance /
- ventilation
-