Elementary Discussion on Key Points of Quality Supervision and Control of River Demarcation and Shoreline Planning
-
摘要: 河道管理范围划界与岸线规划工程的主要内容是规划设计阶段的工作,其成果是今后水利行政部门执法的依据,但由于该类工程是近几年才开始实施的,因此没有成熟的类似工程经验,相关规范和技术标准也不完善,监理工作内容与施工监理内容不同。基于此,本文结合对 XXX 省几十条河道管理划界与岸线规划工程项目的监理,分析了监理质量控制要点和经验总结,以期为相关工程建设提供参考。Abstract: The main content of the river management scope demarcation and shoreline planning project is the work in the planning and design stage. The results will be the basis for law enforcement by the water conservancy administrative department in the future, but because this type of project has only been implemented in recent years, it is not mature The similar engineering experience, related specifications and technical standards are not perfect, and the content of supervision work is different from that of construction supervision. Based on this, this article combines the supervision of dozens of river management demarcation and shoreline planning projects in XXX Province, analyzes the key points of supervision quality control and summary of experience, in order to provide references for related project construction.
点击查看大图
计量
- 文章访问数: 17
- HTML全文浏览量: 2
- PDF下载量: 0
- 被引次数: 0