Application of Comprehensive Drainage System in TBM Tunneling with Large Slope and Long Distance
-
摘要: 在大坡比 TBM 顺坡掘进过程中,隧洞涌水及 TBM 施工废水对施工影响较平洞 TBM 隧洞开挖的危害更为显著。本文通过对新疆某项目水文地质资料分析,以及在 TBM 开挖过程中隧洞水流特点及危害进行分析,针对其特征与危害,结合实际施工中的实践,总结出一套以强排为主,局部设置辅助排水的综合性排水系统,有效解决了类似项目中的排水问题。Abstract: In the process of tunneling along the slope of a large slope than TBM, the impact of tunnel gushing and TBM construction waste water on the construction is more significant than the harm caused by flat tunnel TBM tunnel excavation. This paper analyzes the hydrogeological data of a project in Xinjiang, and analyzes the characteristics and hazards of the tunnel water flow during the TBM excavation process. According to the characteristics and hazards, combined with the actual construction practice, a set of A comprehensive drainage system with auxiliary drainage has been set up to effectively solve the drainage problem in similar projects.
-
Key words:
- reverse slope drainage /
- system drainage /
- water blocking trestle
-
[1] 雷升祥.斜井TBM法施工技术[M].北京:中国铁道出版社,2012. [2] 侯国祥,孙江龙,王先洲,等.工程流体力学[M].北京:机械工业出版社,2006.
点击查看大图
计量
- 文章访问数: 65
- HTML全文浏览量: 5
- PDF下载量: 2
- 被引次数: 0