Special-shaped (Three-curved) Steel Box Girder Assembly and Installation Construction Method
-
摘要: 本工法主要对截面含曲边且双曲线型的钢箱梁加工制作的施工技术做了总结。并结合了钢箱梁结构工厂加工制作与工地现场安装传统的方法。同时针对施工过程质量管理等进行了明确,改变了传统的施工工艺程序,采用 tekla 对钢结构工程进行建模并拆解、大胆革新,确保了工程质量和安全,较大的缩短了施工周期,降低了工程成本。Abstract: This construction method mainly summarizes the construction technology of processing and manufacturing hyperbolic steel box girder with curved edges in section. It combines the traditional methods of steel box girder structure factory processing and on-site installation. At the same time, the quality management of the construction process was clarified, the traditional construction process was changed, and the steel structure project was modeled and dismantled by tekla, and bold innovations were used to ensure the quality and safety of the project, and greatly shorten the construction period. Reduced engineering costs.
-
[1] 蔡枫.上海闸北区体育中心大体积异型钢箱梁加工技术[J].城市住宅,2016,23(11):117-119. [2] 李杰,贺峥,彭文龙.V墩异型钢混梁拱组合桥运营阶段力学性能分析[J].世界桥梁,2017,45(6):60-64. [3] 王玉国,田山坡.京沪高铁天津西站曲线变宽异型钢箱梁设计实践[J].城市道桥与防洪,2012(11):64-66+27. [4] 刘育新.异型钢人行天桥空间静动力分析[J].北方交通,2015(2): 30-33
点击查看大图
计量
- 文章访问数: 82
- HTML全文浏览量: 28
- PDF下载量: 3
- 被引次数: 0