Elementary Analysis on the Compilation Points of the Analysis of the Important and Difficult Points of the Rigid Frame Bridge in the Technical Proposal of Supervision
-
Abstract: This article takes a rigid frame bridge as an example to analyze the important and difficult points in the preparation of technical proposals for supervision and bidding, in order to provide references for relevant technical personnel.
-
[1] 马保林.高墩大跨连续刚构桥[M].北京:人民交通出版社,2001. [2] 张谢东,詹昊,舒洪波,等.大跨度预应力混凝土连续梁桥合龙施工技术研究[J].桥梁建设,2005(2):63-66.
点击查看大图
计量
- 文章访问数: 22
- HTML全文浏览量: 7
- PDF下载量: 0
- 被引次数: 0