Risk Analysis and Technical Research on Construction of Shield Tunneling through Bedrock Protrusions and Upper Soft and Lower Hard Strata
-
摘要: 本文以厦门市地铁 2 号线为例,介绍了城市地铁中基岩凸起段和上软下硬地层的盾构法施工技术,分析了盾构法施工技术在不同地层的掘进参数和注意事项。通过在工程施工前期全面进行地质勘查工作,积极探究工程地质条件,并有计划的进行刀具更换,合理选取掘进参数,可以有效保证该工程的土建施工质量。Abstract: In the process of research, this article takes Xiamen Metro Line 2 as an example, specifically introduces the shield construction technology of the raised section of the bedrock and the upper soft and lower hard strata of the urban subway, and analyzes and discusses the construction technology of the shield method. Tunneling parameters and precautions for different formations. In this way, by doing a comprehensive geological survey in the early stage of the construction of the project, actively exploring the geological conditions of the project, and planned tool replacement, and reasonable selection of the tunneling parameters, the quality of the civil construction of the project can be effectively guaranteed.
-
Key words:
- short distance /
- hard rock /
- soft top and bottom hard /
- shield method
-
[1] 韩超,张利军,张林,等.上软下硬地层盾构法与矿山法交界处隧道段地表加固结构:中国,CN201922112196.4[P].2020-07-17. [2] 宋德文,陈振豪,谢永盛.灰岩区不良地层下盾构施工技术难点研究[J].工程技术研究,2020(7):94-96. [3] 王凯,赵辉,林宝刚,等.南昌地铁3号线上软下硬地层盾构机选型[J].铁道建筑技术,2020(1):111-114+120.
点击查看大图
计量
- 文章访问数: 13
- HTML全文浏览量: 2
- PDF下载量: 0
- 被引次数: 0