Method of Post-tensioned Prestressed Box Girder of a Disease and Coping Strategies
-
摘要: 张拉施工作为预应力箱梁的关键施工工序,任意张拉通病的处治不当均会对箱梁的施工质量产生极大不利影响。鉴于此,本文对后张法预应力箱梁张拉通病的所致成因展开全面分析并提出了相应的应对策略,以供借鉴参考。Abstract: Tension construction is the key construction process of prestressed box girder. Any improper treatment of tension common problems will have a great adverse effect on the construction quality of box girder. In view of this, this paper carries out a comprehensive analysis of the causes of the common failure of post-tensioned prestressed box girder and puts forward the corresponding countermeasures for reference.
-
[1] 陈余,卫千峰,房飞.浅谈后张法现浇箱梁预应力张拉施工问题处理[J].城市建筑,2014(30):227. [2] 李灵,徐秀维.现浇箱梁非梁端预应力张拉断丝的成因及措施[J].筑路机械与施工机械化,2018,35(2):106-109. [3] 李银涛.后张法箱梁张拉锚垫板后混凝土开裂分析及处理措施[J].建筑工程技术与设计,2016(6):1 027+880.