Analysis on the Key Points of Construction Supervision and Control of the Hollow Thin-walled High Piers Combined with Sliding and Flipping
-
摘要: 本文以新疆 G575 线巴里坤至哈密建设项目土建三标空心薄壁墩施工为例,浅谈了滑翻结合空心薄壁高墩施工工艺在本项目的具体应用,总结了在质量、安全方面的控制要点,以供参考。Abstract: This article takes the construction of the third-standard civil hollow thin-walled pier construction of the Xinjiang G575 line Barkun to Hami construction project as an example, discusses the specific application of the sliding-and-turn combined hollow thin-walled high pier construction technology in this project, and summarizes the quality and safety The control points of the aspect are for reference.
点击查看大图
计量
- 文章访问数: 82
- HTML全文浏览量: 7
- PDF下载量: 3
- 被引次数: 0