摘要: 高速公路桥梁建设施工中,场地限制对于钢箱梁的吊装施工影响极大,施工进度常常不能保证,且存在一定安全隐患。鉴于此,文章以实际项目为例就钢箱梁吊装施工关键技术展开简要探讨,以供借鉴参考。Abstract: In the construction of expressway bridge, the site restriction has a great impact on the hoisting construction of steel box girder, the construction progress is often not guaranteed, and there are certain potential safety hazards. In view of this, taking the actual project as an example, this paper briefly discusses the key technology of steel box girder hoisting construction for reference.
-
Key words:
- steel box girder /
- hoisting /
- key construction technology
-
[1] 文德安,孙鹏,周树民,等.港珠澳大桥青州航道桥钢箱梁安装施工技术[J].公路交通科技(应用技术版),2018,14(2):196-200. [2] 王远威,董军,顾忠兴.大块件桥梁钢箱梁免吊装快速施工技术[J].施工技术,2014,43(23):84-86. [3] 欧阳瑰琳,李华彬,吴健,等.红岛航道桥钢箱梁安装支架设计及施工要点[J].中外公路,2013,33(2):117-121.