摘要: 在进行湿陷性黄土高填方路基和殊路基的施工操作时,容易因为受所处区域的土层和地质因素影响,发生沉陷现象,进而影响施工进度和整体质量。基于此,需采取有效的质量管控措施,改善区域土层和地质缺陷,保证施工的有序进行。本文结合具体施工案例,对湿陷性黄土区域的高填方和殊路基工程质量管控处理加以分析,以期为类似工程提供借鉴。Abstract: During the construction of collapsible loess high-fill subgrade and special subgrade, it is easy to cause subsidence due to the influence of the soil layer and geological factors in the area, which will affect the construction schedule and overall quality. Based on this, effective quality control measures need to be taken to improve regional soil layers and geological defects to ensure the orderly construction. This article combines specific construction cases to analyze the quality control of high fill and special subgrade projects in collapsible loess areas, with a view to providing reference for similar projects.
-
Key words:
- high fill roadbed /
- special roadbed /
- quality control /
- construction scheme /
- collapsible loess
-
[1] 高越,陈慧娥,许晓慧,等.某湿陷性黄土路基物理力学性质与处理方法分析[J].工程地质学报,2015(23):127-131. [2] 罗彬,赵书涛.湿陷性黄土路基施工技术研究[C].中国铁道学会铁道工程分会工程地质与路基专业委员会第25届年会暨学术交流会论文集,2016. [3] 熊建安,罗青.低填方浅层湿陷性黄土路基沉降研究[C].全国绿色公路发展论坛,2015. [4] 王钢,田晓,刘志勇,等.巴基斯坦湿陷性黄土路基浸水试验研究[J].土木工程,2019,8(3):659-665. [5] 柴金飞,马伟斌,马超锋,等.瓦日铁路湿陷性黄土路基隐伏病害检测及整治技术[J].铁道建筑,2018,58(1):55-58. [6] 王斌.兰州铁路局管辖内湿陷性黄土路基病害模式及防治措施研究[D].成都:西南交通大学,2016.
点击查看大图
计量
- 文章访问数: 22
- HTML全文浏览量: 8
- PDF下载量: 1
- 被引次数: 0