Optimizing the Coordinated Control System to Improve the AGC Performance Index of the Unit
-
摘要: 本文针对石横热电有限公司 #1 机组协调控制系统问题进行了分析,通过对影响机组协调品质的控制策略进行诊断,并采取相应改进措施。从而确保 #1 机组的协调控制系统能稳定、可靠地投入运行,并进一步投入 AGC 功能,以适应现代化大电网运行管理的需要,满足电网调度两个细则的考核要求。Abstract: This article analyzes the problem of Shiheng Thermal Power Co., Ltd. #1 unit coordinated control system, diagnoses the control strategy that affects the unit's coordinated quality, and takes corresponding improvement measures. So as to ensure that the coordinated control system of unit #1 can be put into operation stably and reliably, and further put in the AGC function to meet the needs of modern large-scale power grid operation and management, and to meet the assessment requirements of the two detailed rules of power grid dispatch.
-
Key words:
- AGC /
- MCS /
- coordinated control /
- optimization
-
[1] 纪煜,姚翠霞,祁海旺.基于煤量预测控制前馈的协调控制系统[J].热力发电,2017(7):131-136. [2] 张瑞亚,田亮.直接能量平衡(DEB)协调控制系统参数整定[J].华北电力大学学报,2017,44(4):85-91. [3] 白德龙,刘鑫屏.火电机组AGC指令前馈滤波逻辑优化设计[J].广东电力,2018(4):75-77.
点击查看大图
计量
- 文章访问数: 10
- HTML全文浏览量: 3
- PDF下载量: 1
- 被引次数: 0