Key Technology of Dam Cofferdam filling Construction of Sanghe II
-
摘要: 桑河二级水电站二期上、下游围堰填筑工程量大、施工工期紧、填筑强度高、质量要求严,因此,切实抓好填筑施工管控极为关键。基于此,本文结合该项目围堰填筑施工实际,就水电站大坝围堰填筑施工关键技术予以细致探究,以供众水电施工同仁借鉴参考。Abstract: The upstream and downstream Cofferdams of phase II of Sanghe hydropower station have large filling quantities, tight construction period, high filling intensity and strict quality requirements. Therefore, it is very important to pay close attention to the filling construction control. Based on this, combined with the actual cofferdam filling construction of the project, this paper makes a detailed exploration on the key technologies of dam cofferdam filling construction of hydropower station for reference.
-
Key words:
- hydropower station dam /
- cofferdam filling /
- key construction technology
-
[1] 谢绍思.去学水电站围堰填筑施工及施工质量控制[J].云南水力发电,2016,32(1):74-77. [2] 岳朝俊,李昊,余胜祥,等.巴基斯坦卡洛特水电站围堰设计与施工[J].水利水电快报,2020,41(3):47-51. [3] 周敏.浅谈向家坝水电站三期横向围堰施工的质量控制[J].四川水力发电,2019,38(2):81-82+96. [4] 付默菡.锦凌水库一期围堰填筑施工工艺与方法探究[J].水利规划与设计,2016(8):133-135
点击查看大图
计量
- 文章访问数: 23
- HTML全文浏览量: 8
- PDF下载量: 1
- 被引次数: 0