Circle Assembly and Installation Technology in Penstock Tunnels of Hydropower Station
-
摘要: 随着我国大型水电站项目不断增加和深度开发,引水发电系统压力钢管工程规模日益增大,传统压力钢管施工技术存在诸多局限,已无法满足大型水电工程的开发需求。压力钢管洞内组圆及安装新技术,旨在快速、安全、优质地完成压力钢管施工,适应安全、环保、健康要求,减少劳动力数量、降低劳动强度,从而提高工期可控性、工程质量、安全性和环保程度。Abstract: With the continuous increase and in-depth development of large-scale hydropower projects in my country, the scale of penstock projects in the water diversion and power generation system is increasing. The traditional penstock construction technology has many limitations and cannot meet the development needs of large-scale hydropower projects. The construction of the penstock hole and the installation of new technologies aim to complete the construction of the penstock quickly, safely and with high quality, adapt to the requirements of safety, environmental protection, and health, reduce the number of labor, and reduce labor intensity, thereby improving the controllability of the construction period, the quality of the project, and the Safety and environmental protection.
-
Key words:
- penstock /
- circle assembly in tunnel /
- installation /
- new technology /
- application
-
[1] 王琦,吴鹏,高升,等.大型压力钢管纵缝气电立焊技术应用[J].焊接技术,2016,45(9):103-105. [2] 孙文,侯明.向家坝电站超大直径引水隧洞压力钢管制作与安装[J].水电站机电技术,2011,34(4):40-42+50. [3] 汪剑国,伍鹤皋,石长征,等.地下埋藏式压力钢管无内支撑安装变形分析[J].水力发电,2016,42(12):50-55.
点击查看大图
计量
- 文章访问数: 97
- HTML全文浏览量: 33
- PDF下载量: 3
- 被引次数: 0