Abstract:
As clean and safe heating way, nuclear heating will become the main force of clean heating in northern China in the future. In the paper, the whole process control of design interface of nuclear heating project with extraction steam is studied from the following three stages: confirm work content, establish interface control system, conduct process control. Based on the interface control experience feedback of No. 3 and No. 4 units of Haiyang Nuclear Power Project, the paper gives the suggestive improvement method of interface control.