Discussion on the Construction Technology of Manual Digging Pile under Special Geological Conditions
-
摘要: 本文简要介绍了在贵州省百里杜鹃公租房项目基础人工挖孔桩施工中遇到特殊地层情况所带来的施工难题,针对施工难题而采取的施工工艺、方法,以及通过针对性的施工处理所得到的经验和体会,并对溶洞处理和地下水处理技术进行阐述,以期为类似工程施工提供参考。Abstract: This article briefly introduces the construction problems caused by the special ground conditions in the manual digging pile construction of the Baili Rhododendron public rental housing project in Guizhou Province, the construction techniques and methods adopted in response to the construction problems, and the targeted construction treatment The experience and experience gained, and the karst cave treatment and groundwater treatment technology are explained, in order to provide reference for the construction of similar projects.
-
Key words:
- Karst cave /
- special stratum /
- manual digging pile /
- hole formation
-
[1] 曹贤发,张家生,刘之葵,等.施工期间人工挖孔桩桩间土稳定性分析[J].岩土力学,2013(5):1 443-1448. [2] 金国龙,王勇,顾开云.人工挖孔桩施工对紧邻基坑围护结构的影响[J].上海交通大学学报,2012(1):84-88. [3] 刘继国,曾亚武.FLAC3D在深基坑开挖与支护数值模拟中的应用[J].岩土力学,2006(3):505-508.
点击查看大图
计量
- 文章访问数: 33
- HTML全文浏览量: 2
- PDF下载量: 1
- 被引次数: 0