Discussion on Commissioning of Circulating Fluidized Bed Boiler System in Thermal Power Plant
-
摘要: 本文以笔者参建的印尼北苏三火电项目为例,对火电厂循环流化床锅炉系统调试中常遇的技术问题及其应对措施展开全面探讨,以期可对众火电建设者有所裨益Abstract: In this paper, the author participated in the construction of Indonesia North Soviet three thermal power project as an example, to thermal power plant circulating fl uidized bed boiler system commissioning often encountered in the technical problems and countermeasures to carry out a comprehensive discussion, in order to benefi t the thermal power builders
-