Abstract:
In the construction process of pumped storage power station shaft, how to solve the vertical transportation of construction workers and ensure the safety of personnel transportation process has always been a difficult problem in front of construction technicians.Therefore, this study redesigned the manned system of shaft construction to achieve the purpose of rapid and overall removal, improving production efficiency and reducing construction cost under the premise of satisfying safety.