| Citation: | DING Hui. Analysis of the Infl uence of the Construction of the Deep and Large Foundation Pit on the Nearby Subway Station[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 6-8. | 
	                | [1] | 
					 JGJ120-2012,建筑基坑支护技术规程[S].北京:中国建筑工业出版社,2012. 
					
					 | 
			
| [2] | 
					 刘国彬,王卫东.基坑工程手册[M].北京:中国建筑工业出版社,2009. 
					
					 | 
			
| [3] | 
					 CJJ/T202-2013,城市轨道交通结构安全保护技术规范[S].北京:中国建筑工业出版社,2013. 
					
					 |