Citation: | LIN Xiangqi. On the Key Points of Fire Prevention Supervision and Inspection of Urban High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 100-102. |
[1] |
王利波.城市高层建筑防火监督检查要点[J].住宅与房地产, 2020(27):221+246.
|
[2] |
王利波.建筑防火监督及消防设施配置分析[J].工程技术研究, 2020(19):223-224.
|
[3] |
宝音巴图.高层建筑防火安全隐患分析及解决措施[J].今日消防,2021(4):100-101.
|
[4] |
文学.住宅高层建筑火灾隐患分析及防火安全措施[J].今日消防, 2021(1):48-49.
|
[5] |
张开瑞.城市高层建筑使用单位防火监督检查要点[J].今日消防,2020(10):121-122.
|
[6] |
王延尚.城市高层建筑防火监督检查要点分析[J].中国新技术新产品,2019(21):140-141.
|
[7] |
刘媛媛.城市高层建筑防火监督检查要点的研究[J].山东工业技术,2019(3):131.
|
[8] |
王鹏.对城市高层建筑防火监督检查要点的研究[J].四川建材, 2017,43(4):282-283
|
[2] | WANG Yahan. Preliminary Study on Related Issues of Urban Green Building Planning and Design[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 89-91. |
[3] | XU Hang. Use of Indoor Fire-fighting Facilities in Fire-fighting and Rescue of High-rise Public Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 99-101. |
[4] | KANG Lingfeng. Application of Fire Fighting Facilities in Fire Fighting and Rescue of High-rise Public Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 120-122. |
[5] | LIU Jinjing. On the Causes of Fire in High-Rise Buildings and Fire Safety Design[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 117-119. |
[6] | LEI Lanlan. Analysis of The Current Situation of Fire Protection Safety of High-Rise Buildings and Fire Protection Countermeasures[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 108-110. |
[7] | LIANG Yifeng. Thoughts on the Fire Safety Management of High-rise Buildings in Taizhou[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 117-119. |
[8] | WANG Tao. Fire Engineering Design and Construction Analysis of High-Rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 123-125. |
[9] | LI Jiazhang. Current Situation of Fire Safety Management of High-rise Buildings in China and Optimization Suggestions[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 98-100. |
[10] | SANG Hong. Diffi culties and Main Points Analysis of Fire Fighting and Rescue in High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 109-111. |
[11] | MAO Fenghua. How to Do a Good Job of High-rise Building Fire Hazards and Fire Supervision[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 123-125. |
[12] | SONG Chuanzhen. Thinking about Fire Hidden Danger and Fire Prevention Supervision of High Rise Building[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 112-114. |
[13] | MA Xiaoming. Research on Hidden Danger and Effective Strategy of Fire Prevention Supervision of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 106-108. |
[14] | ZHANG Wenjing. Analysis of Fire Safety Problems and Fire Supervision Strategies in High-Rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 120-122. |
[15] | DU Hang. Countermeasures of Strengthening Fire Control Supervision and Management of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 95-97. |
[16] | XU Jiang. Hidden Fire Hazards and Fire Supervision of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 126-128. |
[17] | ZANG Yansheng. Problems and Strategies of Fire Prevention Supervision and Inspection of Urban High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 117-119. |
[18] | TAN Caixing. Discussion on Key Points and Methods of Supervision and Inspection of Building Fire Protection Facilities[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 105-107. |
[19] | ZHAO Liang. Discussion on Fire Hidden Danger and Fire Prevention Supervision of High Rise Buildings[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 125-126. |
[20] | GAO Pengcheng. Analysis on Hidden Fire Hazards of High-rise Buildings and Their Fire Protection Supervision Work[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 101-102. |