Citation: | WEI Guangke. A Fast and Non-stop Power Supply Device for Power Supply[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 62-63. |
[1] |
许可明,雄炜.配电网自动化系统[M].重庆:重庆大学出版社,2007.
|
[2] |
束洪春.考虑断路器非同期合闸的行波数据采集方式及保护算法[J].电网技术,2005(22):84-88.
|
[3] |
刘建强,黄锦明,伊立挺,等.应急发电车0.4 kV电源快速接入用户侧装置研制[J].中国高新技术企业,2017(1):10-11.
|
[4] |
张斌.基于表带点触式过流技术的0.4 kV应急电源快速接入装置的研制与应用[J].中国高新技术企业,2016(21):45-47.
|
[5] |
周洁,许解,王永平.应急发电车的配置与管理[J].电力需求侧管理,2014,16(5):55-58.
|
[6] |
张华,华月申.应急电源车新型快速接头研究[J].供用电,2013,30(4):43-47.
|
[7] |
王逊峰,顾金,钱忠.应急电源车的应用分析[J].华东电力,2011,39(12):2 135
-2 137.
|
[1] | FANG Yufeng. Management and Maintenance Analysis of Fossil-fuel Power Station Coal Handling Machinery[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 68-70. |
[2] | CHEN Jiezhan. Discussion on Installation Technology and Development of Offshore Wind Turbine in Deep Water Area[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 55-58. |
[3] | LIU Xuegang. The Application Status and Improvement Measures of Traction Motor Automatic Cleaning Equipment are Analyzed[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 79-81. |
[4] | WANG Xiao, JIA Jitao, ZHANG Changchun, LI Lin. Comparative Study on Test Performance of CMS System of Wind Turbine[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 55-57. |
[5] | LI Xuzhi. Fire Protection Design and Research of High Rise Building Fire Power Supply Lighting[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 3-4. |
[6] | HE Guibin. Summary of Installation and Debugging Technology of Electrical Equipment in Power Supply and Distribution Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 45-47. |
[7] | PENG Songlong. Design and Research of Low Voltage Power Distribution System in Building B of Yongtai City Shopping Center[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 20-22. |
[8] | YAN Zhuoke. Application of Power Distribution Automation Technology in Power Distribution System[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 65-67. |
[9] | WANG Kai. Analysis on the Coordination of Automatic Reclosing and Relay Protection in Power Plant[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 113-114. |
[10] | ZHOU Hejun. Research Status of Solar Thermal Power Generation Technology and Analysis of Key Equipment Problems[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 106-107. |
[11] | SONG Xingjian. Application Research of SNCR Denitration Technology in Waste Incineration Power Plant[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 83-84. |
[12] | WANG Tingting. Application of Photovoltaic Power Generation Technology in Green Building[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 108-109. |
[13] | WANG Lei. Fault Tree Research on the Ablation Problem of Electric Control Lock Matching Motor[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 73-74. |
[14] | XUAN Yanwen. Fault Diagnosis Method of Asynchronous Motor Based on Deep Learning[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 42-44. |
[15] | CHEN Yongfei. Discussion on Step Motor Control Based on Single Chip[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 45-46. |
[16] | XUE Tengfei. Design Method of Power Supply and Distribution System for Large Commercial Complex[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 27-28. |
[17] | QIAN Yuxing. Research on Safety Measures for Overhaul and Maintenance of Power Plant Mechanical Equipment[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 118-120. |
[18] | WANG Lei. Discussion on the Problems and Solutions of Distribution Network and Distribution Line in Safe Operation[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 107-108. |
[19] | WANG Yan. Analysis Method and Maintenance of Steam Turbine Failure[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 60-61. |
[20] | LIU Yuxin. Common Faults and Case Analysis of Large Turbogenerator[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 45-46. |