Citation: | HE Guibin. Summary of Installation and Debugging Technology of Electrical Equipment in Power Supply and Distribution Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 45-47. |
[1] |
石微.电力系统电气设备安装与调试的技术分析[J].建材与装饰,2018(25):232-233.
|
[2] |
李少彬.电力系统电气设备安装与调试的技术分析[J].科技与创新,2014(17):67.
|
[3] |
廖祥君.电力系统电气设备安装与调试的技术分析[J].科技展望,2016,26(20):106.
|
[4] |
陈中继,吴佳慧.建筑设计防火规范在石化工业建筑设计中的应用[J].石化技术,2019,26(3):209.
|
[1] | LIU Ce. Problems in Project Cost Control and Project Cost Control Strategy[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 117-119. |
[2] | ZHANG Wenjing. Analysis of Fire Safety Problems and Fire Supervision Strategies in High-Rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 120-122. |
[3] | YOU Shoufeng. Analysis on Installation and Debugging of Equipment in Sewage Treatment Plant[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 124-126. |
[4] | WEI Lingfei. Research on the Problems and Countermeasures of Construction Project Bidding[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 124-125. |
[5] | XIE Lan. Brief Introduction to Installation and Debugging of Electrical Instrument in Chemical Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 71-73. |
[6] | LI Qinghua. Problems and Countermeasures in Construction Quality Management of Housing Construction Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 68-70. |
[7] | CHEN Yan. Analysis of the Problems and Countermeasures in the Quality Management of Mmunicipal Engineering Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 61-62. |
[8] | ZHOU Yucheng. Problems Existing in the Quality of Building Fire Protection Products and Solutions[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 117-119. |
[9] | YIN Weijia. Explore the Problems and Solutions of Electrical Construction in Intelligent Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 51-53. |
[10] | CONG Minghui. Research on Existing Problems and Countermeasures of Expressway Construction Management[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 64-65. |
[11] | DAI Jiemin. Analysis of Existing Problems and Countermeasures in River Regulation[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 113-114. |
[12] | YOU Jiang. Discuss the Problems and Countermeasures of Construction Engineering Construction Management[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 73-74. |
[13] | CHEN Zhiliang. Analysis on the Existing Problems and Countermeasures of Construction Engineering Inspection Management[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 68-69. |
[14] | LIU Bingchen. Analysis of Common Problems and Countermeasures in Installation of Building Electromechanical Equipment[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 71-73. |
[15] | ZHAO Xing. Talking about the Deep Foundation Pit Supporting Technology in Civil Foundation Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 54-55. |
[16] | XU Han. Practice and Exploration of Smart Community Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 112-113. |
[17] | HAN Chaosheng. Control Strategy of Soil Filling and Rolling Construction Technology for Hydraulic Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 95-96. |
[18] | YE Qingang. Research on the Experience and Management Measures of Electrician Maintenance Methods in Mechanical Equipment[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 84-85. |
[19] | SHAO Wei. Talking about the Existing Problems and Optimizing Measures in Prefabricated Building[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 34-35. |
[20] | ZHENG Guohui. Analysis on the Problems and Countermeasures of the Construction Safety Management of Super High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 74-75. |