YU Haizhou. Construction Technique of Asymmetric Suspension Casting of Main Girder of Cable-stayed Bridge with Four Cable Faces in Single Tower[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 21-24.
Citation: YU Haizhou. Construction Technique of Asymmetric Suspension Casting of Main Girder of Cable-stayed Bridge with Four Cable Faces in Single Tower[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 21-24.

Construction Technique of Asymmetric Suspension Casting of Main Girder of Cable-stayed Bridge with Four Cable Faces in Single Tower

  • Received Date: 2021-02-12
  • Publish Date: 2021-03-28
  • The Panhai Bridge is a single-tower, four-cable plane cable-stayed bridge with pylons and beams. In order to ensure the safety of the structure, the main girder is constructed by asymmetric cantilever pouring, and the line shape and stress of the bridge vary greatly. Therefore, it is necessary to adjust the bridge's performance by unbalanced counterweight and externally applied temporary prestressed beams under the premise of ensuring the safety of the bridge structure construction balance. For this reason, this paper proposes an asymmetric cantilever construction technology for the main girder of a four-cable plane cable-stayed bridge with a single tower and no need of counterweight and temporary prestressing. That is, the west side of the main beam full hall bracket is fi rst erected, and the main tower section is poured at the same time, and then the east side sectioned hanging basket cantilever construction is carried out. The engineering example shows that in the case of complex terrain, the use of asymmetrical cantilever construction of the main girder can not only meet the requirements of structural design specifi cations, but also shorten the construction period, reduce the project cost and construction diffi culty, and ensure construction safety.

     

  • loading
  • [1]
    苗家武.超大跨度斜拉桥设计理论研究[D].上海:同济大学, 2006.
    [2]
    戴杰.钢箱梁斜拉桥合理成桥状态与合理施工状态优化方法研究[D].西安:长安大学,2016.
    [3]
    高宗余.沪通长江大桥主桥技术特点[J].桥梁建设,2014,44(2): 1-5.
    [4]
    贾志强.大跨度非对称高墩连续刚构桥施工动态仿真分析[D].兰州:兰州交通大学,2010.
    [5]
    俞文龙,朱飞,张胜雷.非对称单侧悬臂施工斜拉桥结构参数敏感性研究[J].铁道建筑技术,2019(11):14-17+41.

    [6]
    李颖,王常峰,窦国昆.非对称悬臂施工连续梁拱组合桥线形监控难点分析[J].城市道桥与防洪,2020(2):85-88+12.
    [7]
    辛跃辉,鄢勇,胡步毛.非对称超大跨度单线连续刚构设计与研究[J].铁道工程学报,2012,29(8):45-48

    +93.
    [8]
    许惟国,范文理.泸州长江二桥非对称大跨连续刚构的施工控制[J].中南林学院学报,2006(6):136-140.
    [9]
    孙小猛,闫子才,朱大勇,等.独塔单索面部分斜拉桥非对称施工技术[J].施工技术,2011,40(8):83-85.
    [10]
    张韬.独塔非对称矮塔斜拉桥施工控制及结构性能研究[D].重庆:重庆交通大学,2018.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (194) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return