ZANG Jian. Analysis on the Key Points of Construction Supervision and Control of the Hollow Thin-walled High Piers Combined with Sliding and Flipping[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 39-40.
Citation:
ZANG Jian. Analysis on the Key Points of Construction Supervision and Control of the
Hollow Thin-walled High Piers Combined with Sliding and Flipping[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 39-40.
ZANG Jian. Analysis on the Key Points of Construction Supervision and Control of the Hollow Thin-walled High Piers Combined with Sliding and Flipping[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 39-40.
Citation:
ZANG Jian. Analysis on the Key Points of Construction Supervision and Control of the
Hollow Thin-walled High Piers Combined with Sliding and Flipping[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 39-40.
This article takes the construction of the third-standard civil hollow thin-walled pier construction of the Xinjiang G575 line Barkun to Hami construction project as an example, discusses the specific application of the sliding-and-turn combined hollow thin-walled high pier construction technology in this project, and summarizes the quality and safety The control points of the aspect are for reference.