Volume 3 Issue 1
Jan.  2021
Turn off MathJax
Article Contents
DAI Shubao. Discussion on the Integrated Framing Method of Upper Span Railway Bridge with Side Beam and Anti-collision Wall[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 11-13,26.
Citation: DAI Shubao. Discussion on the Integrated Framing Method of Upper Span Railway Bridge with Side Beam and Anti-collision Wall[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 11-13,26.

Discussion on the Integrated Framing Method of Upper Span Railway Bridge with Side Beam and Anti-collision Wall

  • Received Date: 2020-12-05
  • Rev Recd Date: 2021-01-20
  • Available Online: 2021-09-22
  • Publish Date: 2021-01-28
  • This article discusses the integrated construction method of prefabricated box girder side beam and anti-collision wall of a municipal bridge with a span of 35 m across the Beijing-Kowloon Railway Interchange on Fuyang Runhe Road, and analyzes the prefabricated box girder side beam and anti-collision wall There are problems in the integrated construction method of beam body eccentricity, gantry crane and bridge girder crane, beam body transportation, beam body erection, etc., and through analysis, measures to solve the problems are formulated, and the measures are verified through examples Effectiveness. It provides valuable experience for the implementation of the integrated construction method of the side beam and anti-collision wall of the upper-span railway bridge.

     

  • loading
  • [1]
    JTG/T 3650-2020,公路桥涵施工技术规范[S].
    [2]
    JTG 3362-2018,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
    [3]
    TB 10303-2020,铁路桥涵工程施工安全技术规程[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (260) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return